Opportunity Sri Lanka | » Package 1A – Power System Strengthening and Renewable Energy Integration Project (PSSREIP)
Package 1A – Power System Strengthening and Renewable Energy Integration Project (PSSREIP)

Package 1A – Power System Strengthening and Renewable Energy Integration Project (PSSREIP)

Construction of Mirigama 220kv switching station, Mirigama 220/33 kv grid substation and Peliyagoda 132/33 kv grid substation. The Power System Strengthening and Renewable Energy Integration Project (PSSREIP-1A) is a strategic initiative aimed at enhancing Sri Lanka’s power transmission infrastructure to support renewable energy integration and grid stability. Implemented by the Ceylon Electricity Board (CEB), this project focuses on the development of high-voltage transmission substations and grid networks at critical locations, including Mirigama and Peliyagoda. The project is structured to enable Sri Lanka to meet its increasing electricity demand while ensuring seamless integration of renewable energy sources, reducing dependence on fossil fuels, and improving overall energy security.

Share this:
Tender Eligibility : Contact OSL for more details
Line Ministry : Ministry of Energy
Line Agency : Ceylon Electricity Board (CEB)
Project Site : Mirigama and Peliyagoda
Component Stander : Funding available
Bid Security : LKR 205 Million / USD 675,000
Bid Validity : 180 days
Issuance of tender document : Ceylon Electricity Board (CEB)
Tender Document Fee : LKR 150,000
Pre Bid Meeting : 2nd April 2025. Time 10.00am at the Office of Project Director, CEB. No 227/1, Robert Gunawardena Mawatha, Battaramulla, Sri Lanka.
Estimated Project Cost : Contact OSL
Contract Period : 730 Days to complete the project
Tender Closing Date : 30th April 2025
Tender Procedure : N/A
Funding : Funding available with Asian Development Bank (ADB)
Tender Code : VBS/TD/10032025/Y_1

    For More Info and Help






    Leave a Comment