Kolonnawa Canal Diversion Scheme – Stage I
Under this project, it is expected to widen the existing canals to improve the flow of storm water in the Colombo area during periods of low water levels in the Kelani River and also to make arrangements to mitigate the flood condition occurring in the Kolonnawa area during periods of high water level.
Tender Eligibility : | Minimum average annual construction turnover of LKR 1,260 Million |
Line Ministry : | Ministry of Megapolis and Western Development |
Bid Security : | LKR 7,000,000 |
Bid Validity : | 28 days beyond bid validity period |
Tender Document Fee : | LKR 60,000 |
Pre Bid Meeting : | 03rd May 2018 |
Estimated Project Cost : | LKR 632 Million without VAT |
Tender Closing Date : | 1030 hrs on 18th May 2018. |
Funding : | International Bank for Reconstruction and Development (IBRD) |
Tender Code : | VBS/TD/0150201/Y_1 |